# HBM demand — X 热门讨论 (2026-09-23 19:57 UTC)
## @wallstengine (Wall St Engine) · 09-23 19:07 · ♥66 ↻11 💬5 TSMC REPORTEDLY PLANS 3%-6% WAFER PRICE HIKES STARTING JANUARY 2027
DigiTimes says increases could be larger for 2nm and 3nm, where demand is running ahead of supply.
Supply-chain sources say:
• 8-inch utilization is above 100% • Sub-45nm capacity is fully loaded • Orders are visible through 2030 • Arizona pricing remains elevated due to higher manufacturing costs
The demand is being driven by AI-related GPUs, ASICs, HBM, power chips, controllers, analog, sensors, optics and advanced packaging.
TSMC declined to comment. https://x.com/wallstengine/status/2102837334123397435